Friday, 13 October 2017

Transient's diary, weeks 6 and 7

At last, it’s really happening. Things are on the up. There’s beginning to be a glimmer of a hint of a chance of a hope of a prospect of our moving back into our house before long.

The new kitchen has tiles on the floor. It has some kitchen units in place. Why, it even has a new boiler. No water to the boiler (or taps or anything else). No electricity to light the boiler. No gas to light, indeed. But, hey, that can all come in time.
A kitchen taking shape
Note the boiler. Not that it’s working yet or anything
And it’s not just in the kitchen that we have tiles. There are even tiles on the walls of the shower room, and very fine they look too. Of course, no water, electricity or, indeed, water heated by the boiler thats not yet working either but, again, hey, we shouldn’t ask for too much too soon.

Besides, there’s no shower head.

The shower room has great tiles
Though no shower yet...
xThere’s been even more progress upstairs. The loft no longer looks like a loft at all. It’s beginning to look like a bedroom. As well as the window with its great view (well, OK, mostly of scaffolding for the moment but one can picture the view beyond it), we now have plastered walls and a proper floor.

New room emerging with a fine view of scaffolding
But – en suite doesn’t really mean a bath in a bedroom, does it?
There’s a bath too. I like to think it’s not in the right place – I don’t think ‘en suite’ means actually in the bedroom. Some time they’ll no doubt move it into the little kind of cubile they’ve fashioned next to bedroom – yes, it’s going to be more en-cubicle than en suite, but there’s no room for a real suite under our roof.

It’s all happening, though, isn’t it? The end of the vagrancy beckons. To be capped by a place I’m keener and keener to get back to…

The end is in sight.

No comments: